Information Page for Regular Users of the Tithe Barn
This page will be used to inform you of dates, changes and request that you get back to us with information etc
Architects for the Extension
Sorry this is short notice, but the architect is coming to present their plans to the committee on Monday 127th at 7pm. If you would care to come along and see what is proposed the you would be most welcome.
Notice Boards
The notice board at the front is getting tatty and we are planning to buy a new one. This will be slightly larger and will have a glazed front. We would like as many regular users as possible to take advantage of the advertising space, so to maintain a bit of order we are going to ask that notices are usually A5, with occasional A4, but no larger. This will make it as fair as possible to as many users as possible. Sorry, but the glazed front will not be suitable for notices with a tear off tab.
Meeting About The Extension
A meeting was held on Monday October 6th at 8pm in the Meeting Room (room 4) to discuss the extension with regular hirers. These are my notes of the meeting:
Regular Users Meeting Monday 6th Oct 2008 Meeting Room 20:00 – 21:00 - Notes of meeting
Present
|
Regular Users Caroline Liggett Kumon Maths Peter Healy Rugby Rookies Lenora Smith Play Group Roger Surtees Tithe Dance Club (?) |
Committee John Beattie Chair of Trustees Judith Gibbins Treasurer Phil Taylor Jim Stevenson Sandra Raven Peter Richmond |
Apologies Ann Sohn-Rethel Pottery John Andrews Movements Plus Fran Nichols Get Active Exercise |
Introduction
The committee are required to provide disabled access to the main hall but can not achieve this within the current building without reducing the usability of the rooms. The extension will allow a lift to be installed and will provide space for a bar, kitchen and lavatory on the same level as the main hall, it will also provide increased useable space on the ground floor.
The plans drawn up to gain planning permission were shown and the project and its progress described. The project has gained planning permission and listed building consent. It is yet to gain building regulations approval. Church Architectural were contracted to provide support to the project up to planning approval. Subsequently the committee have appointed a project manager and are shortly to appoint an architect, to take the project to completion.
The Project Proposal and the Clients Requirements are to be made accessible on the web site.
Discussion of the proposals
Disruption of use during construction: Those present said that they were keen for there to be as little disruption as possible since they wanted to remain open for specific periods. It was suggested that in the main hall the south windows would remain intact for the entire period of the build and would only effect main hall users during the day for a limited period when the break through was made and the doors fitted. It was asked that this be undertaken during the summer or half term breaks to minimise disruption.
Access during construction: It was suggested that an alternative externally lockable entrance be made using the current kitchen external door. Users would also be able to gain access through the main hall and meeting room fire exits, but only when opened from the inside.
The level of light in the main hall on the loss of the three south windows: Will need to be addressed during the design phase.
Other topics were discussed in less detail such as the uses of the ground floor room, the position of the front door, and a ceiling in the new first floor room.
WHAT ARE YOUR CHRISTMAS DATES? Please can you email me with your Christmas and New Year dates so that I can release rooms for parties etc and so that we don't charge you for times you are not there over the Christmas period.
First Aid: Note there is a new first aid box now hanging in the foyer of the Long Room (room 5). If you do need to use it please will you fill in a report sheet in the new 'Incident Book' that is on the desk in the office. Lets hope we don't need it but just in case it's nice to know it's there. And thanks to Lenora Smith for arranging it for us.
New Regular Users Page: As soon as we know any activities and dates we will post them here. Currently we don't have any dates. We are reviewing tenders prior to appointing an architect. Following that we will have plans drawn up to allow us to apply for building regulations approval. We will then go out to tender for a builder. After tender review we will appoint a builder and get going as soon as they are available. So I don't expect to start building until after Christmas at the earliest.
Caretaker: We post any changes to procedures and will tell you when Duanne is on holiday and you have to put up with the committee letting you in.
Complaints: Please get back to me with any difficulties you have as soon as possible. We can deal with them and put changes into place to prevent them happening again.
last updated 15 Nov 2008